On the 1st of August, 2018, the Klintsovskaja Cogeneration Plant was opened in the Bryansk Oblast, Russia.
The Plant was constructed in co-operation with Filter AS and its St. Petersburg subsidiary Vapor. Vapor was the main contractor and Filter was responsible for the design and the supply of equipment. The plant was equipped with three GE Jenbacher JMS 620GS-N.L cogeneration gas engines and a boilerhouse with two steam boilers. The electricity power output of the new energy complex is 10 MW and the thermal power output is 7MW. The electricity produced is diverted to the grid and heat is delivered to the district heating network of town Klintsy.

klincovskaya tec